1000 Person Package Treatment Plant

Compact packaged wastewater treatment plant with a capacity of 1000 people — daily flow rate of 195-200 m³/day, installation in 14-18 days.

1000
Person Capacity
195-200 m³/gün
Daily Flow
2.20×13.50×2.70 m
Dimensions (W×L×H)
14-18 gün
Installation Time
ARBİO-1000
Model Code

The packaged treatment plant for 1000 people is manufactured at our Ankara factory in Turkey under the model name ARBİO-1000. The system has a daily wastewater treatment capacity of 195-200 m³/day and is made of ST37 carbon steel body (4-6 mm) with a lifespan of 15-20 years. It includes 14-18 days of installation on-site, a 12-month warranty, and turnkey service.

Who Is This Capacity For?

Capacity for 900-1500 people for high population complexes:

  • 5-star resort hotels — luxury tourism with 200-400 rooms
  • Mega housing projects — complexes with 300-600 apartments
  • Educational campuses — dormitory + student living area
  • Hospital complexes — city hospitals with 150-250 beds
  • Mega military complexes — training and headquarters
  • Exhibition and congress centers — event facilities

Typical Use Scenarios

Typical usage examples:

  • 400-room 5-star resort: Water recovery is critical — 95% reuse in landscape irrigation, saving over 50,000 m³ annually.
  • 600-unit mega housing project: Standalone eco-friendly solution in areas without municipal discharge limits.
  • 200-bed city hospital: Advanced biological N-P + UV — specialized healthcare wastewater profile.
  • University campus with 5000 students: Dormitory + academic + service facilities treated at a single point.

Proposed Technology

The technology we recommend for this capacity:

  • MBR or MBBR — selected according to need (MBR for water recovery, MBBR for cost-effectiveness)
  • Advanced biological N-P removal — mandatory
  • UV + ozone disinfection — dual-stage safety
  • Sludge dewatering — belt press or decanter
  • Complete SCADA automation — operator panel + remote monitoring + alarm
  • Backup pump/blower — redundancy for reliability

Technical Details

Technical specifications (for 1000 people / 195-200 m³/day):

  • Reactor material: ST37 carbon steel, 4-6 mm thickness
  • Corrosion protection: Epoxy paint or bituminous coating, 15-20 years lifespan
  • BOD removal: 92-96% (inlet 300-400 mg/L → outlet 15-20 mg/L)
  • COD removal: 88-94% (inlet 600-800 mg/L → outlet 80-100 mg/L)
  • SS removal: 95+% (outlet 20-30 mg/L)
  • NH4-N removal: 85-90% (advanced biological process)
  • Automation: PLC controlled, SCADA remote monitoring optional
  • Energy consumption: Typical 0.4-0.7 kWh/m³ of treated water
  • Footprint: Reactor only + 1 m service area
  • Warranty: Mechanical 12 months, body 5 years
  • Certifications: CE, ISO 9001, ISO 14001

Investment & Return

Investment analysis for a system of 1000 people:

  • Annual treated water: ~73,000 m³
  • Reusable water (for irrigation): ~62,050 m³ (85%)
  • Operational savings (water bill): Between 25-40% of the total annual water expenses
  • Avoidance of municipal sewer fees: Additional savings of +30-50% depending on the region
  • Prevention of environmental compliance penalties: Severe penalties for exceeding discharge limits
  • Estimated payback period: Typically between 2-4 years
  • Equipment lifespan: 15-20 years (over 70% of the investment lifespan is profit)
  • Sustainability: Direct contribution to the conservation of water resources
Turnkey Solution

Let's Bring the Project to Life Together

Request a Detailed Quote
Engineering Design Field analysis + wastewater profile + process selection
Domestic Manufacturing Production of ST37 steel at our Ankara factory.
Delivery + Installation Container shipment + on-site assembly
Commissioning + Training Operator training + 12 months warranty
Certificate & Standard CE · ISO 9001/14001/45001
Long-Term Support 24/7 service + spare parts + maintenance