Outside of Working Hours +90 552 876 55 30 info@arsistek.com
Countries We Operate In 19 countries with on-site experience and engineering support
Our Global Market Experience · Browse country details for field references, regulation insights and engineering support
See All Countries
Request a Quote

6000 Person Package Treatment Plant

Compact packaged wastewater treatment plant with a capacity of 6000 people — daily flow rate of 1195-1200 m³/day, installation time of 38-50 days.

6000
Person Capacity
1195-1200 m³/gün
Daily Flow
3.20×13.50×3.20 m
Dimensions (W×L×H)
38-50 gün
Installation Time
ARBİO-6000
Model Code

The 6000-person packaged treatment plant is manufactured at our Ankara factory in Turkey under the model name ARBİO-6000. The system has a daily wastewater treatment capacity of 1195-1200 m³/day and is made of ST37 carbon steel body (4-6 mm) with a lifespan of 15-20 years. On-site installation takes 38-50 days, comes with a 12-month warranty, and is provided as a turnkey service.

Who Is This Capacity For?

5000-6000+ person capacity for municipal and large industrial projects:

  • Municipal wastewater treatment plant — town, district, neighborhood
  • Large organized industrial zone central treatment — organized industry with 50+ factories
  • Mega resorts — Maldives, Antalya, Bodrum style resort
  • City hospitals — complexes with 500+ beds
  • Mega university campuses — 20,000+ students
  • Military base complexes — large garrison
  • Industrial mega complexes — petrochemical, steel, food mega factories *For capacities above this, transitioning to classic activated sludge or MBR systems is recommended.*

Typical Use Scenarios

Typical usage examples:

  • Neighborhood/town with 15,000 population: Municipal wastewater treatment plant — urban sewage.
  • Industrial zone with 50+ factories: Sectoral pre-treatment + central biological treatment + advanced filtration.
  • Mega resort complex (1500+ rooms): Independent water management — SWRO drinking + packaged wastewater + reuse in irrigation.
  • University with 20,000 students: Including campus-scale social facilities. Important: Above this capacity, a conventional activated sludge plant or MBR system may be more economical. Alternatives will be evaluated after site analysis.

Proposed Technology

The technology we recommend for this capacity:

  • Conventional activated sludge plant — more economical than a packaged system
  • Advanced biological N-P removal — A2/O or UCT process
  • MBR retrofit option — infrastructure for future water recovery
  • Anaerobic sludge stabilization — biogas production option
  • Complete dewatering + drying — industrial scale
  • SCADA + DCS — 24/7 monitoring + alarm + reporting
  • API + IAF (for oil-containing wastewater) — in industrial applications *For capacities above this, we offer conventional plant design instead of a packaged system.*

Technical Details

Technical specifications (6000 people / 1195-1200 m³/day):

  • Reactor material: ST37 carbon steel, 4-6 mm thickness
  • Corrosion protection: Epoxy paint or bituminous coating, 15-20 years lifespan
  • BOD removal: 92-96% (inlet 300-400 mg/L → outlet 15-20 mg/L)
  • COD removal: 88-94% (inlet 600-800 mg/L → outlet 80-100 mg/L)
  • SS removal: 95+% (outlet 20-30 mg/L)
  • NH4-N removal: 85-90% (advanced biological process)
  • Automation: PLC controlled, SCADA remote monitoring optional
  • Energy consumption: Typical 0.4-0.7 kWh/m³ of treated water
  • Footprint: Reactor only + 1 m service area
  • Warranty: Mechanical 12 months, body 5 years
  • Certifications: CE, ISO 9001, ISO 14001

Investment & Return

Investment analysis for a system serving 6000 people: - Annual treated water: ~438,000 m³ - Reusable water (for irrigation): ~372,300 m³ (%85) - Operational savings (water bill): Between 25-40% of total annual water expenses - Avoidance of municipal sewer fees: Additional savings of +30-50% depending on the region - Prevention of environmental compliance penalties: Severe penalties for exceeding discharge limits - Estimated payback period: Typically between 2-4 years - Equipment lifespan: 15-20 years (more than 70% of investment lifespan is profit) - Sustainability: Direct contribution to the conservation of water resources

Turnkey Solution

Let's Bring the Project to Life Together

Request a Detailed Quote
Engineering Design Field analysis + wastewater profile + process selection
Domestic Manufacturing Production of ST37 steel at our Ankara factory.
Delivery + Installation Container shipment + on-site assembly
Commissioning + Training Operator training + 12 months warranty
Certificate & Standard CE · ISO 9001/14001/45001
Long-Term Support 24/7 service + spare parts + maintenance

6000 Person Package Treatment Plant İhtiyacınız İçin Net Teklif Alın

Saha analizi, mühendislik tasarımı, imalat, sevkiyat ve kurulum dahil tam paket. 12 ay garanti + işletme desteği.

Write via WhatsApp Get a Quick Quote