The 4000-person packaged treatment plant is manufactured in our Ankara factory in Turkey under the model name ARBİO-4000. The system has a daily wastewater treatment capacity of 790-800 m³/day and is made of ST37 carbon steel (4-6 mm) with a lifespan of 15-20 years. On-site installation takes 28-35 days, comes with a 12-month warranty, and is provided as a turnkey service.
Who Is This Capacity For?
Capacity for 2000-4000 people for mega settlement and public projects:
- Mega resort hotels — holiday villages with 400-800 rooms
- Neighborhood scale settlements — 600-1500 apartments
- City hospitals — complexes with 250-500 beds
- University mega campuses — 5000+ students
- OSB joint wastewater — small-medium organized industrial zone
- Municipality/small town — sewage treatment
- Industrial mega facilities — large factory complex
Typical Use Scenarios
Typical usage examples:
- 800-room resort (Maldives style): Luxury tourism + reuse in irrigation + MBR option possible.
- Town/county municipality: Central wastewater treatment for a settlement with a population of 3000-4000.
- 30-factory organized industrial zone: Each factory discharges to a common central facility after pre-treatment — sectoral filter.
- 500-bed city hospital: Mega health complex — strict discharge limits.
- University mega campus: 5000-10000 students + dormitory + social facilities.
Proposed Technology
The technology we recommend for this capacity:
- Classic activated sludge + advanced N-P removal — the most economical for this scale
- MBR optional — if there is a strict water recovery target
- Sludge stabilization — anaerobic or aerobic
- Sludge dewatering — industrial decanter
- Full SCADA + redundancy — critical capacity, no downtime accepted
- Online monitoring sensors — pH, DO, MLSS, BOD proxy
Technical Details
Technical specifications (4000 people / 790-800 m³/day):
- Reactor material: ST37 carbon steel, 4-6 mm thickness
- Corrosion protection: Epoxy paint or bituminous coating, 15-20 years lifespan
- BOD removal: 92-96% (inlet 300-400 mg/L → outlet 15-20 mg/L)
- COD removal: 88-94% (inlet 600-800 mg/L → outlet 80-100 mg/L)
- SS removal: 95+% (outlet 20-30 mg/L)
- NH4-N removal: 85-90% (advanced biological process)
- Automation: PLC controlled, SCADA remote monitoring optional
- Energy consumption: Typical 0.4-0.7 kWh/m³ of treated water
- Footprint: Reactor only + 1 m service area
- Warranty: Mechanical 12 months, body 5 years
- Certificates: CE, ISO 9001, ISO 14001
Investment & Return
Investment analysis for a system serving 4000 people: - Annual treated water: ~292,000 m³ - Reusable water (for irrigation): ~248,200 m³ (85%) - Operational savings (water bill): Between 25-40% of the total annual water expenses - Avoidance of municipal sewer fees: Additional savings of +30-50% depending on the region - Prevention of environmental compliance penalties: Severe penalties for exceeding discharge limits - Estimated payback period: Typically between 2-4 years - Equipment lifespan: 15-20 years (over 70% of the investment lifespan is profit) - Sustainability: Direct contribution to the conservation of water resources
Diğer Kapasiteler
Farklı kapasite ihtiyacınız için aşağıdaki 23 seçeneği inceleyin
4000 Person Package Treatment Plant İhtiyacınız İçin Net Teklif Alın
Saha analizi, mühendislik tasarımı, imalat, sevkiyat ve kurulum dahil tam paket. 12 ay garanti + işletme desteği.