The 14,000-person packaged treatment plant is designed for mega-scale projects under the model name ARBİO-14000. With a daily wastewater treatment capacity of 2795-2800 m³/day, the system is optimal for town municipalities, mega industrial zones, ultra-luxury resorts, mega hospitals, or industrial complexes. Modular hybrid steel plant or conventional concrete plant options are available. Turnkey engineering + manufacturing + shipping + installation.
Who Is This Capacity For?
Ultra-mega capacity for over 14,000 people designed for municipalities, organized industrial zones, and large industrial complexes:
- Town/county municipality wastewater — main urban sewage treatment
- Mega organized industrial zone facility — organized industrial zone with 100+ factories
- Ultra-luxury mega resort — world brand holiday resorts with 2000+ rooms
- City hospital complexes — multidisciplinary campuses with 1000+ beds
- Mega university campuses — 30,000+ students + dormitory + social facilities
- Military base/garrison — regional command center
- Mega industrial complex — petrochemical, steel, food mega factories
- Airport + logistics centers — large operational campuses
Typical Use Scenarios
Typical usage examples (mega scale):
- Municipality with a population of 21,000: Urban wastewater full central treatment, end discharge point of sewer infrastructure.
- Mega organized industrial zone with 100+ factories: Common biological + advanced treatment center after sectoral pre-treatment.
- Mega resort (2500+ rooms): Water recovery + 95% reuse in irrigation — million m³ annual savings.
- Mega hospital campus with 1000+ beds: UV + MBR + advanced N-P + advanced biological — strict health wastewater profile.
- Mega university with 30,000 students: Dormitory + academic + social facilities treated at a single point.
Important: For this capacity, instead of a package system, a conventional activated sludge plant or conventional MBR plant is often more economical. Alternatives are evaluated after site analysis.
Proposed Technology
The technology we recommend for this capacity:
- Conventional activated sludge plant — an open concrete plant is more economical than a package at this scale
- Advanced biological N-P removal — A2/O, UCT, or Bardenpho process
- MBR retrofit infrastructure — ready for future water recovery
- Anaerobic sludge stabilization — biogas production + energy recovery
- Industrial dewatering — centrifuge decanter + thermal drying
- DCS full automation — 24/7 monitoring + alarm + reporting + remote control
- Online monitoring — pH, DO, MLSS, BOİ proxy, turbidity, flow rate
- Redundancy — 100%+50% capacity in critical equipment
- API separator + IAF — for industrial wastewater containing oil
*If a package system is offered at this capacity, a modular hybrid solution (2 or 3 parallel modules) will be provided.*
Technical Details
Technical specifications (14,000 people / 2795-2800 m³/day):
- Reactor material: ST37 carbon steel body (modular hybrid) or concrete plant
- Corrosion protection: Epoxy paint + bituminous coating, 20-25 years lifespan
- BOD removal: 94-97% (inlet 300-500 mg/L → outlet 10-18 mg/L)
- COD removal: 90-95% (inlet 600-900 mg/L → outlet 60-90 mg/L)
- SS removal: 96+% (outlet 15-25 mg/L)
- NH4-N removal: 90-95% (A2/O advanced biological process)
- Total N removal: 80-88%
- Total P removal: 85-92% (chemical + biological)
- Automation: PLC + SCADA + DCS optional, full redundancy
- Energy consumption: Typical 0.35-0.55 kWh/m³ (mega-scale efficiency increase)
- Footprint: Modular hybrid or open plant — according to field analysis
- Warranty: Mechanical 12 months (extendable to 24 months), body 10 years
- Certificates: CE, ISO 9001/14001/45001, OHSAS
- Sludge treatment: Dewatering + optional drying + biogas production
Investment & Return
Investment analysis for a system with 14,000 capacity:
- Annual treated water: ~1,020,175 m³
- Reusable water (for irrigation/process): ~918,158 m³ (90% — high efficiency at mega scale)
- Operational savings: Between 30-50% of the total annual water expenses
- Avoidance of municipal sewer fees: Additional savings of +40-60% depending on the region
- Biogas production potential: Electricity generation through anaerobic sludge stabilization
- Prevention of environmental compliance penalties: Risk of million TL fines for exceeding discharge limits
- Estimated payback period: Typically between 3-6 years
- Equipment lifespan: 20-30 years (mega scale investment — long-lasting)
- Sustainability: ESG reporting + carbon credit potential
Diğer Kapasiteler
Farklı kapasite ihtiyacınız için aşağıdaki 23 seçeneği inceleyin
14000 Person Package Treatment Plant İhtiyacınız İçin Net Teklif Alın
Saha analizi, mühendislik tasarımı, imalat, sevkiyat ve kurulum dahil tam paket. 12 ay garanti + işletme desteği.