Outside of Working Hours +90 552 876 55 30 info@arsistek.com
Countries We Operate In 21 countries with on-site experience and engineering support
Our Global Market Experience · Browse country details for field references, regulation insights and engineering support
See All Countries
Request a Quote

Canik Firearms Inc.

Sector Weapons and Defense Industry
Year 2025
Region Samsun
Country Turkey
Capacity 10 m³ / Day Capacity
Process Industrial Wastewater Treatment Plant
Client Canik Firearms Inc.

Project Gallery Görseller yakında eklenecek

About the Samsun Wastewater Treatment Plant Project

Samsun - Canik Silah Inc.

Canik Silah Inc. for the wastewater treatment plant project carried out in Samsun has a capacity of 10 m³ / Day. The project was completed in 2025 as a turnkey solution. Additionally, the design, equipment supply, installation, and commissioning processes were conducted within our company. This ensured a coordinated and error-free delivery to the customer from a single source.


Technical Specifications and Capacity

The fundamental technical parameters of the project are summarized in the table below. This information provides an overview of the project's scope, engineering requirements, and delivery process.

Project Technical Information
Project Location Samsun
Capacity 10 m³ / Day Capacity
Process Type Industrial Wastewater Treatment Facility
Completion Year 2025
Discharge Standard SKKY (Water Pollution Control Regulation)

Applied Wastewater Treatment Plant Technology

Industrial wastewater treatment plant targets a sector-specific composition. A multi-barrier approach is utilized. This approach includes pre-treatment, primary, biological, and advanced treatment stages. As a result, the effluent becomes compliant with discharge limits.


Sectoral Wastewater Assessment

Correct engineering design is the foundation of a project's success. Wastewater characterization and target discharge limits determine the design output. Additionally, SKKY compliance is a minimum requirement for every project.


Result and Reference Value

At the end of the project, the discharge water has been produced with a quality that meets the SKKY (Water Pollution Control Regulation) discharge standards. Additionally, the facility is equipped with a modern automation infrastructure. This maximizes operational continuity and energy efficiency. For detailed technical information, you can refer to the Industrial Wastewater Treatment Guide. Our articles, such as industrial wastewater treatment methods and SKKY discharge limits 2026 guide, address different aspects of the subject.

For similar capacity and sectoral needs, our Arsistek engineering team provides free preliminary assessment and technical recommendations. In addition, we offer consulting services for capacity increase or modernization of your existing facility. With over 20 years of experience, we provide reliable solutions to the industry, especially in the field of wastewater treatment plants. For more information, you can contact us through our contact page.

Get a Quote for a Similar Project

Free site survey · 24h quote · 20+ years experience

Write via WhatsApp Get a Quick Quote