Outside of Working Hours +90 552 876 55 30 info@arsistek.com
Countries We Operate In 21 countries with on-site experience and engineering support
Our Global Market Experience · Browse country details for field references, regulation insights and engineering support
See All Countries
Request a Quote

Hinal Group LLC

Year 2026
Region Bakü, Azerbaycan
Country Azerbaijan
Capacity 1500 Person / Day Capacity
Process Reinforced Concrete Domestic Wastewater
Client Hinal Group LLC.

Project Gallery Görseller yakında eklenecek

About the Baku Reinforced Concrete Wastewater Treatment Project

Baku - Hinal Group LLC

Hinal Group LLC. This reinforced concrete wastewater treatment project, carried out in Baku, Azerbaijan, has a capacity of 1500 Persons / Day. The project was completed in 2026 as a turnkey solution. Additionally, the design, equipment supply, installation, and commissioning processes were conducted within our company. This ensured a coordinated and error-free delivery to the customer from a single source.


Technical Specifications and Capacity

The basic technical parameters of the project are summarized in the table below. This information provides an overview of the project's scope, engineering requirements, and delivery process.

Project Technical Information
Project Location Baku, Azerbaijan
Capacity 1500 Persons / Day Capacity
Process Type Reinforced Concrete Domestic Wastewater
Completion Year 2026
Discharge Standard SKKY (Water Pollution Control Regulation)

Applied Reinforced Concrete Wastewater Treatment Technology

Reinforced concrete municipal wastewater treatment plant is a long-lasting solution with on-site construction. The typical lifespan is 30+ years. It is an ideal building block for high capacity and continuous operation. Additionally, the activated sludge process is a standard biological stage.


Sectoral Wastewater Evaluation

Correct engineering design is the foundation of project success. Wastewater characterization and target discharge limits determine the design output. Additionally, ISO compliance is a minimum requirement for every project.


Result and Reference Value

At the end of the project, the effluent has been produced with a quality that meets the discharge standards of SKKY (Water Pollution Control Regulation). Additionally, the facility is equipped with a modern automation infrastructure. This maximizes operational continuity and energy efficiency. For detailed technical information, you can refer to the Industrial wastewater treatment guide. Our articles, such as industrial wastewater treatment methods and SKKY discharge limits 2026 guide, address different aspects of the topic.

For similar capacity and sectoral needs, our Arsistek engineering team provides free preliminary assessment and technical recommendations. In addition, we offer consulting services for capacity enhancement or modernization of your existing facility. With over 20 years of experience, especially in the field of reinforced concrete wastewater treatment, we provide reliable solutions to the industry. For more information, you can contact us through our contact page.

Get a Quote for a Similar Project

Free site survey · 24h quote · 20+ years experience

Write via WhatsApp Get a Quick Quote