P-Technicks Ltd.

Sector Construction Sector
Year 2025
Region Ruanda
Country Ruanda
Capacity 500 Person / Day Capacity
Process Reinforced Concrete Domestic Wastewater
Client P-Technicks Ltd.

Project Gallery Görseller yakında eklenecek

About P-Technicks LTD Reinforced Concrete Wastewater Treatment Project

Rwanda - P-Technicks LTD

P-Technicks LTD has completed this reinforced concrete wastewater treatment project in Rwanda with a capacity of 500 Persons / Day. The project was completed as a turnkey solution in 2025. Additionally, the design, equipment supply, installation, and commissioning processes were carried out by our company. This ensured a coordinated and error-free delivery to the customer from a single source.


Technical Specifications and Capacity

The basic technical parameters of the project are summarized in the table below. This information provides an overview of the project's scope, engineering requirements, and delivery process.

Project Technical Information
Project Location Rwanda
Capacity Capacity for 500 People / Day
Process Type Reinforced Concrete Domestic Wastewater
Completion Year 2025
Discharge Standard SKKY (Water Pollution Control Regulation)

Applied Reinforced Concrete Wastewater Treatment Technology

P-Technicks LTD Reinforced Concrete Domestic Wastewater Treatment Plant is a long-lasting solution with site construction. The typical service life is 30+ years. It is an ideal building block for high capacity and continuous operation. Additionally, the activated sludge process is a standard biological stage.


Sectoral Wastewater Evaluation

Correct engineering design is the foundation of project success. Wastewater characterization and target discharge limits determine the design output. Additionally, SKKY compliance is a minimum requirement for every project.


Result and Reference Value

At the end of the project, the discharge water is produced with a quality that meets the discharge standards of SKKY (Water Pollution Control Regulation). Additionally, the facility is equipped with a modern automation infrastructure. This maximizes operational continuity and energy efficiency. For detailed technical information, you can refer to the Industrial wastewater treatment guide. Our articles such as industrial wastewater treatment methods and SKKY discharge limits 2026 guide address different aspects of the subject.

For similar capacity and sectoral needs, our Arsistek engineering team provides free preliminary assessment and technical recommendations. In addition, we offer consultancy services for the capacity increase or modernization of your existing facility. With over 20 years of experience, especially in the field of reinforced concrete wastewater treatment, we provide reliable solutions to the industry. For more information, you can contact us through our contact page.

Get a Quote for a Similar Project

Free site survey · 24h quote · 20+ years experience

Write via WhatsApp Get a Quick Quote