Project Details
About the Karmando Ice Cream Wastewater Treatment Plant Project

Karmando Ice Cream wastewater treatment facility project carried out in Kahramanmaraş has a capacity of 20 m³ / Day. The project was completed in 2021 as a turnkey solution. Additionally, the design, equipment supply, installation, and commissioning processes were carried out by our company. This ensured a coordinated and error-free delivery to the customer from a single source.
The fundamental technical parameters of the project are summarized in the table below. This information provides an overview of the project's scope, engineering requirements, and delivery process.
Karmando Ice Cream Industrial Wastewater Treatment Plant targets a sector-specific composition. A multi-barrier approach is utilized. This approach includes pre-treatment, primary, biological, and advanced treatment stages. As a result, the effluent becomes compliant with discharge limits.
The dairy industry wastewater contains high COD (1,500-6,000 mg/L) and FOG. CIP washings cause pH fluctuations. Biological degradability is high (BOD/COD 0.7+). Additionally, biogas utilization through anaerobic processes provides economic benefits. The dairy industry can meet a significant portion of its facility's energy needs with the biogas it produces.
At the end of the project, the effluent has been produced to meet the discharge standards of SKKY (Water Pollution Control Regulation). Additionally, the facility is equipped with a modern automation infrastructure. This maximizes operational continuity and energy efficiency. For detailed technical information, you can refer to our Dairy Factory Wastewater Treatment Guide. Furthermore, articles such as industrial wastewater treatment methods and SKKY discharge limits 2026 guide address different aspects of the subject.
For similar capacity and sectoral needs, our Arsistek engineering team provides free preliminary assessment and technical advice. In addition, we offer consulting services for capacity enhancement or modernization of your existing facility. With over 20 years of experience in the wastewater treatment plant sector, we provide reliable solutions to the industry. For more information, you can contact us through our contact page.
Frequently Asked Questions
Sources and Relevant Standards
Related Projects
Other reference projects in the same sector and process type.
Get a Quote for a Similar Project
Free site survey · 24h quote · 20+ years experience