Outside of Working Hours +90 552 876 55 30 info@arsistek.com
Countries We Operate In 21 countries with on-site experience and engineering support
Our Global Market Experience · Browse country details for field references, regulation insights and engineering support
See All Countries
Request a Quote

Turkmenistan Treatment Lamella

Year 2024
Region Türkmenistan
Country Turkmenistan
Capacity Lamella & Sedimentation
Process Industrial Wastewater Treatment Plant
Client Baysu Treatment Inc.

Project Gallery Görseller yakında eklenecek

About the Turkmenistan Wastewater Treatment Plant Project

Turkmenistan - Baysu Treatment Inc.

This wastewater treatment facility project carried out in Turkmenistan has a Lamella & Settling capacity. The project was completed in 2024 as a turnkey solution. Additionally, the design, equipment supply, installation, and commissioning processes were conducted by our company. This ensured a coordinated and flawless delivery to the customer from a single source.


Technical Specifications and Capacity

The basic technical parameters of the project are summarized in the table below. This information provides an overview of the project's scope, engineering requirements, and delivery process.

Project Technical Information
Project Location Turkmenistan
Capacity Lamella & Settling Systems
Process Type Industrial Wastewater Treatment Plant
Completion Year 2024
Discharge Standard SKKY (Water Pollution Control Regulation)

Applied Wastewater Treatment Plant Technology

Turkmenistan Lamella / Settling Industrial Wastewater Treatment Plant targets a sector-specific composition. A multi-barrier approach is utilized. This approach encompasses pre-treatment, primary, biological, and advanced treatment stages. As a result, the effluent becomes compliant with discharge limits.


Sectoral Wastewater Evaluation

Correct engineering design is the foundation of project success. Wastewater characterization and target discharge limits determine the design output. Additionally, SKKY compliance is a minimum requirement for every project.


Result and Reference Value

At the end of the project, the discharge water has been produced with a quality that meets the SKKY (Water Pollution Control Regulation) discharge standards. Additionally, the facility in Turkmenistan is equipped with a modern automation infrastructure. This has maximized operational continuity and energy efficiency. For detailed technical information, you can refer to the Industrial Wastewater Treatment Guide. Our articles, such as industrial wastewater treatment methods and SKKY discharge limits 2026 guide, address different aspects of the subject.

For similar capacities and sectoral needs, our Arsistek engineering team provides free preliminary assessment and technical recommendations. In addition, we offer consulting services for capacity increase or modernization of your existing facility. With over 20 years of experience in the field of wastewater treatment plants, we provide reliable solutions to the industry. For more information, you can contact us through our contact page.

Get a Quote for a Similar Project

Free site survey · 24h quote · 20+ years experience

Write via WhatsApp Get a Quick Quote