Outside of Working Hours +90 552 876 55 30 info@arsistek.com
Countries We Operate In 21 countries with on-site experience and engineering support
Our Global Market Experience · Browse country details for field references, regulation insights and engineering support
See All Countries
Request a Quote

Alfen Construction Inc.

Year 2025
Region Diyarbakır
Country Turkey
Capacity 2000 Persons / Day Capacity
Process Package Treatment Facility
Client Alfen Construction Inc.

Project Gallery Görseller yakında eklenecek

About the Package Treatment Project

Package Treatment - Alfen Construction Inc.

Alfen Construction Inc. has completed this package treatment project in Diyarbakır with a capacity of 2000 Persons / Day. The project was completed in 2025 as a turnkey solution. Additionally, the design, equipment procurement, installation, and commissioning processes were carried out within our company. This ensured a coordinated and error-free delivery to the customer from a single source.


Technical Specifications and Capacity

The fundamental technical parameters of the project are summarized in the table below. This information provides an overview of the project's scope, engineering requirements, and delivery process at a glance.

Project Technical Information
Project LocationDiyarbakır
Customer / InstitutionTOKİ
CapacityCapacity of 2000 Persons / Day
Process TypePackage Treatment Facility
Completion Year2025
Discharge StandardSKKY (Water Pollution Control Regulation)

Applied Package Treatment Technology

Package wastewater treatment system is a compact solution pre-manufactured in a factory environment. All process equipment is gathered in a single module. It is transported to the site and commissioned within 1-4 weeks. This allows for installation that is 5-10 times faster compared to traditional concrete construction facilities. Additionally, it provides compact space utilization. The possibility of modular expansion offers long-term advantages.


Residential Project Wastewater Characteristics

TOKİ and mass housing projects generate domestic wastewater. Sizing according to the number of users is critical. Additionally, the possibility of modular expansion provides a significant advantage for social structure projects. Fast installation solutions that are compatible with the construction site process are preferred.


Result and Reference Value

At the end of the project, the discharge water has been produced with a quality that meets the SKKY (Water Pollution Control Regulation) discharge standards. Additionally, the facility is equipped with a modern automation infrastructure. This maximizes operational continuity and energy efficiency. For detailed technical information, you can refer to the What is Package Treatment guide. Our articles such as industrial wastewater treatment methods and SKKY discharge limits 2026 guide address different aspects of the subject.

For similar capacities and sectoral needs, our engineering team at Arsistek provides free preliminary studies and technical recommendations. In addition, we offer consulting services for capacity increase or modernization of your existing facility. With over 20 years of experience, we provide reliable solutions to the industry, especially in the field of Package Treatment. For more information, you can contact us through our contact page.

Get a Quote for a Similar Project

Free site survey · 24h quote · 20+ years experience

Write via WhatsApp Get a Quick Quote