Outside of Working Hours +90 552 876 55 30 info@arsistek.com
Countries We Operate In 21 countries with on-site experience and engineering support
Our Global Market Experience · Browse country details for field references, regulation insights and engineering support
See All Countries
Request a Quote

HMP Construction Inc.

Sector Construction Sector
Year 2015
Region Eskişehir
Country Turkey
Capacity 200 Person / Day Capacity
Process Package Treatment Facility
Client HMP Construction Inc.

Project Gallery Görseller yakında eklenecek

About the 200-Person Package Treatment Project

Package Treatment - HMP Construction Inc.

HMP Construction Inc. implemented this package treatment project in Eskişehir with a capacity of 200 Persons / Day. The project was completed in 2015 as a turnkey solution. Additionally, the design, equipment supply, installation, and commissioning processes were carried out by our company. This ensured a coordinated and error-free delivery to the customer from a single source.


Applied Package Treatment Technology

Package wastewater treatment system is a compact solution manufactured in a factory environment. All process equipment is gathered in a single module. It is transported to the site and commissioned within 1-4 weeks. This allows for installation that is 5-10 times faster compared to traditional concrete construction facilities. Additionally, it provides compact space utilization. The modular expansion capability offers long-term advantages.

Project Technical Information
Project Location Eskişehir
Capacity 200-Person Package Treatment Facility
Process Type Domestic Package Mobile Sewage Treatment Facility
Completion Year 2015
Discharge Standard SKKY (Water Pollution Control Regulation)

Wastewater Characteristics of Construction Project

The construction sector projects generate standard domestic wastewater. Capacity sizing based on the number of users is a fundamental criterion. Additionally, the modular expansion capability is an important advantage for future capacity increases.


Result and Reference Value

 The 200-Person Package Treatment Plant Project has produced effluent that meets the discharge standards of SKKY (Water Pollution Control Regulation). Additionally, the facility is equipped with a modern automation infrastructure. This maximizes operational continuity and energy efficiency. For detailed technical information, you can refer to the Package Treatment Guide. Our articles such as industrial wastewater treatment methods and SKKY discharge limits 2026 guide address different aspects of the subject.

For similar capacity and sectoral needs, our Arsistek engineering team provides free preliminary assessment and technical recommendations. In addition, we offer consulting services for capacity enhancement or modernization of your existing facility. With over 20 years of experience, we provide reliable solutions to the industry, particularly in the field of package treatment. For more information, you can contact us through our contact page.

Get a Quote for a Similar Project

Free site survey · 24h quote · 20+ years experience

Write via WhatsApp Get a Quick Quote